Friday, November 13, 2026

Construction Begins on $60M Gateway Centre in Grafton, Targeting 5 Star NABERS Rating

Ground-level render of the Gateway Centre Grafton, highlighting the parking area, landscaped surrounds, and access to major retail entrances

Grafton, NSW, August 2025 – Construction has commenced on the $60 million Gateway Centre in Grafton, a landmark large format retail (LFR) project set to reshape the Northern Rivers retail landscape.

The development, led by the Tyas family’s property arm CADRE, is being delivered by Tycorp Construction on the 3.42-hectare site at 21 Through Street, positioned at the southern entry to the new Grafton Bridge.

In collaboration with sustainability consultants HipvHype, CADRE is aiming for the Gateway Centre to become Australia’s first LFR destination to achieve a 5-star NABERS rating. The project design brings together the expertise of international architect Bruce Henderson and local landscape studio LARC.

CADRE reports that 90 percent of the centre is already pre-committed, with national tenants such as Anaconda, Metcash Total Tools, Repco, Petbarn, RSEA, Anytime Fitness, Oz Education Childcare, and Banjos Bakery confirmed. The project seeks to redefine the regional LFR model by replacing traditional signage-heavy designs with steel detailing inspired by the original Grafton Bridge, extensive native planting, vertical greenery, and integrated public art.

“This is a community-centric space designed for low impact and social interaction to bring community and soul back into the spaces we create,” said Nicholas Tyas, Co-Director at CADRE.

“CADRE has worked closely with national A-Grade tenants to purpose-build regional spaces to suit their needs whilst respecting the values of the Northern Rivers region, which is all about community and being present. We have brought this to life in line with our ethos at CADRE, which is to design with empathy towards the end-user.”

The development is financed by the Commonwealth Bank, supported by its Coffs Harbour team.

James Tyas, Director of Tycorp Construction, added: “We’re proud to be delivering a project that reflects the future of regional development. Construction is about more than just building, it’s about translating vision into something tangible and lasting. Our team is focused on delivering a centre that locals will be proud of for generations.”

Construction is progressing on the outdoor arcade, which will feature food trucks, EV charging stations, and a central spine mural. Later this year, a public art competition in partnership with the Grafton Regional Gallery will invite local artists to contribute to the project.

Note: The information presented in this article is for general informational purposes only and should not be relied upon as legal, financial, or professional advice. While we make every effort to fact-check and verify the information presented, we cannot guarantee its accuracy or completeness. Readers are encouraged to independently verify any information they find on our website and to consult with relevant professionals before making any decisions based on the information presented. The Australian Development Review does not own the rights to the information included within this article, and furthermore, there is no infringement intended from the included text and images within.

Leave a Reply

Your email address will not be published. Required fields are marked *